What is the typical lead time for orders?
Aurashu’s typical lead time depends on the product type, order quantity, customization level, and current production schedule, but we are committed to ensuring fast and reliable delivery for all global clients.
For most standard HVAC products — such as fan coil units (FCUs), air handling units (AHUs), purification modules, and control terminals — the average production lead time is 2–4 weeks after order confirmation and receipt of the advance payment. These products benefit from our modular production lines and stocked core components, allowing efficient assembly and testing.
For custom-engineered solutions — including high-precision constant temperature and humidity systems, special voltage or frequency configurations, or BMS-integrated intelligent control systems — the lead time typically extends to 4–8 weeks, depending on the complexity of design verification, component sourcing, and testing requirements.
Large-scale or international project orders may require additional coordination time for export packaging, logistics, and quality certification (e.g., CE, UL, ISO, or project-specific inspection). Aurashu maintains close cooperation with global logistics partners to ensure timely sea, air, or rail shipment and provides full documentation support including packing lists, certificates of origin, and customs compliance paperwork.
In urgent cases, priority production and expedited delivery services are available. By optimizing the production schedule and supply chain resources, Aurashu can shorten the lead time to as little as 7–10 working days for selected models.
Before placing an order, our sales and logistics teams will provide a detailed delivery timeline and keep customers updated on real-time progress through our order tracking system, ensuring transparency and peace of mind throughout the process.