Pre-project: Feasibility & Scheme Optimization
Conduct surveys and load calculations.Forecast energy use and compare system options with cost analyses. Deliver reports, comparisons, and a green certification strategy.
Conduct surveys and load calculations.Forecast energy use and compare system options with cost analyses. Deliver reports, comparisons, and a green certification strategy.
Supply all required technical documents and datasheets rapidly. Support prototype demos and provide FAT reports to strengthen bids. Deliver a complete bid technical pack and installation guides.
Provide development packages and BIM models for seamless integration. Conduct critical system simulations to ensure performance. Deliver detailed drawings, models, and engineering recommendations.
Support comprehensive product customization and specialized material options. Enforce rigorous factory testing to ensure quality and consistency. Deliver prototype approvals, production schedules, and all relevant certificates.
Plan phased shipments aligned with project milestones. Provide detailed logistics tracking and enforce strict on-site inspection. Deliver schedules, shipment notices, inspection records, and a spare parts strategy.
Provide full installation support and on-site supervision. Execute system commissioning and BMS integration. Deliver commissioning reports and operational data.
Execute performance verification and third-party testing. Resolve acceptance issues and provide all required documentation. Deliver final acceptance reports and validation records.
Provide comprehensive O&M manuals and training. Deliver maintenance plans and optional SLA-based managed services. Supply all manuals, training records, and service agreements.
Provide continuous energy monitoring and operational analytics. Deliver energy-saving retrofit recommendations and extended warranty services. Supply detailed consumption reports and upgrade proposals.
Dedicated project manager + site engineer for unified coordination.
Written sign-offs at design, prototype, production, shipment, installation and acceptance stages.
Ensure mass production matches prototype performance.
Minimize shipping damage and delivery risk.
Project-specific spare kits and tiered SLA options (e.g., 7×24, 48-hour onsite response).
Project Name | Reference Period |
---|---|
Design & energy simulation | 2–4 weeks |
Prototype fabrication & FAT | 4–8 weeks |
Mass production | 6–12 weeks (dependent on scale) |
On-site installation & commissioning | 2–8 weeks (dependent on scope) |
Through energy-efficient design and intelligent controls.
Via complete technical documentation and third-party validation.
Thanks to BIM and pre-assembled solutions.
Through superior IAQ, acoustic comfort and zoned control.
Through SLAs, training and spare parts support.