Needs Assessment & Experience-Driven Design
Conduct IAQ and energy baseline audits, define zoning and usage scenarios, and provide optimization recommendations with baseline and zoning reports.
Conduct IAQ and energy baseline audits, define zoning and usage scenarios, and provide optimization recommendations with baseline and zoning reports.
Design airflow and acoustics with low-noise ducts and low-vibration fans to meet comfort targets, supported by test reports and retrofit plans.
Provide development packages and BIM Implement multi-stage filtration, VOC removal, fresh air systems, and continuous monitoring, delivering specs, sensor lists, and alarm settings.
Adopt high-efficiency equipment, VFDs, heat recovery, and demand-controlled ventilation, integrated with BMS/cloud for optimization and reporting.
Apply phased upgrades and modular swap-outs with off-peak deployment to minimize impact, supported by retrofit plans and module specifications.
Supervise installation, conduct performance testing, and fine-tune systems, delivering logs, trial data, acceptance reports, and sign-off.
Offer SLA-based maintenance with rapid response, preventive service, and remote monitoring, supported by manuals, schedules, and inspection logs.
Analyze energy and IAQ data to propose retrofits and support certification, delivering periodic reports, proposals, and ROI analysis.
Offer long-term performance tracking with TCO analysis, helping clients reduce lifecycle cost and maximize system ROI.
Dedicated PM + field engineer for unified project coordination.
Written sign-offs from design to installation ensure project transparency.
Validate acoustic, comfort and IAQ performance under real conditions.
Project-specific spares and coverage reduce downtime risk.
Deliver all fire, health and safety certificates for full conformity.
Project Name | Reference Period |
---|---|
Design & energy simulation | 2–4 weeks |
Prototype fabrication & FAT | 4–8 weeks |
Mass production | 6–12 weeks (dependent on scale) |
On-site installation & commissioning | 2–8 weeks (dependent on scope) |
Higher dwell times and consumption rates through better comfort.
Reduced operating costs improve leasing and sales appeal.
Quiet, clean environments minimize risks and disputes.
Shorter project timelines reduce impact on daily operations.
Defined roles and preventive care ease maintenance burden.