Services for MEP General Contractors & Bidding Contractors

MEP General Contractors & Bidding Contractors——
Full-Cycle Service Description

Core Services ——
Lifecycle-Oriented Core Services
Pre-Tender & Tender Support
Rapid technical response with datasheets, certifications, FAT data and bid clarifications to boost competitiveness.
Design Development & BIM Coordination
Provide equipment selection, interface drawings, BIM/IFC models and safety/installation plans to minimize rework and risks.
Manufacturing & Quality Control
Custom manufacturing with FAT, batch consistency checks, and strict IQC/IPQC/OQC to ensure uniform quality.
Logistics & Phased Delivery
Professional packaging, insured transport and phased delivery aligned with project milestones for smooth handover.
Site Installation & Commissioning
Field engineer supervision, BMS/fire/fresh air integration, and performance testing with complete reports.
Acceptance Support & Third-Party Validation
Onsite support for inspections, remediation and re-testing, plus optional third-party performance validation.
Handover, O&M & Training
Deliver O&M manuals, spare parts lists, and provide training to client teams for smooth operation and maintenance.
Warranty & After-Sales Service
Flexible warranty and SLA options, spare parts strategies, and rapid response channels to minimize downtime.
Project Management & Regulatory Compliance
Coordinate with MEP contractors, align schedules, and provide certificates/reports to meet regulatory and handover requirements.

Sample List ——
Key Deliverables
- Bid technical pack (specs, performance data, BOM)
- BIM/IFC models and development drawings
- FAT reports and third-party certificates
- Shipping & acceptance documentation, packing lists
- Installation/commissioning/acceptance reports
- Completion report, O&M manual, training records, SLA

Ensuring Excellence ——
Quality Assurance & Project Control

Single Point of Contact (SPOC)
Dedicated project manager to streamline communications and ensure unified coordination.

Milestone Management
Stage sign-offs and delivery checklists to avoid delays and disputes.

Contractual Change Control
Clear workflows and impact assessments for change orders to minimize claims.

Experienced Field Support
Rapid on-site troubleshooting to reduce work stoppages and risks.

Performance Guarantees (Optional)
Defined contractual guarantees for key parameters with remedies if not met.
From Design to Delivery ——
Typical Timeline
| Project Name | Reference Period |
|---|---|
| Design & energy simulation | 2–4 weeks |
| Prototype fabrication & FAT | 4–8 weeks |
| Mass production | 6–12 weeks (dependent on scale) |
| On-site installation & commissioning | 2–8 weeks (dependent on scope) |
Value We Bring to Developers ——
How We Add Value
Optimized CAPEX
Accurate load calculations and multi-scheme comparisons prevent oversizing and unnecessary capital investment.
Faster Project Delivery
With phased delivery, pre-assembled solutions, and efficient commissioning, we shorten construction timelines and support on-time handover.
Higher Tender Success Rates
By providing rapid, compliant technical packs and third-party validated data, we help contractors improve bid competitiveness and increase win rates.
Minimized Acceptance Risks
Third-party testing, traceable QA/QC records, and SPOC management ensure higher first-pass acceptance and fewer disputes.
Strong After-sales Assurance
Spare parts pools, SLA response options, and extended warranty packages secure project reliability beyond handover.